In March 2020, Shantui Janeoo set up the first 2XSJHZS180-3R concrete batching plants in 20 days, marking the company's success in assisting the construction of the first high-speed railway project linking Jinan and Zhengzhou.
The delivery of the equipment was highly appreciated by the customer both in terms of speed and quality.All departments work together during the outbreak of epidemic protection at the same time, help customers to return to work efficiently and production, to fully demonstrate the company "the first is in the mix does not dispute characteristic passion culture" and "one day when the two and a half days with" cultural characteristic of efficiency, is the company's practice of "customer satisfaction is our tenet" concrete embodiment, made a satisfactory answer to the customer.
The Zheng Ji high-speed section of the west of shandong luyu provinces provincial boundary, the liaocheng in shandong, Texas, jinan, access to the jinan west railway station, shen county, liaocheng west, south, pingyin, jinan chiping west five sites, total length of 170 km, the design speed of 350 km/h, is the national "much starker choices-and graver consequences-in" in the development of modern comprehensive transportation system planning of "ten longitudinal horizontal" integrated transport channel "the 10th longitudinal" (yantai to chongqing transport corridor) and shandong "three horizontal been five even" an important part of comprehensive transport corridor.After completion, it will only take about one and a half hours from Jinan to Zhengzhou, which will end the history of no direct high-speed railway between Shandong and Henan, and construct a fast passenger transport channel connecting Shandong Peninsula area with central China and the western region.