1.It's suitable for production of water construction, and the special structure meets the requirements of the water enviroment.
2.Compact structure can reduce the construction cost of the platform.
3.The equipment has high safety and can adapt to the platform foundation settlement and the influence of typhoon.
4.Equipped with large volume aggregate bins, one-time feeding can meet the production of 500m3 of concrete(can be customized according to requirements), equipped with movable cover to meet the normal construction in rain and snow.